188 sources held. Each entry states what the document is, what it
establishes, where it is cited, and how far it has been checked.
Two corrections are recorded in the published work rather than silently made. A claim that no government
response to the 18 November motion existed was wrong: a spokesperson refused the motion the next day, and
the record now says so. A claim that the state's submission “rules out” market-led benefit was narrowed: it
rebuts the assumption that benefit arrives with investment, which is not the same thing.
S1
Hydro Tasmania, Submission 152, House of Assembly Government Administration Committee A, Inquiry into AI Data Centres in Tasmania
2026-09-22 quoted, checked source
Cited in: Data centres · 18 research chapters
Read the full entry
S2
Tasmanian Government, Submission 154, signed Felix Ellis MP, Minister for Innovation, Science and the Digital Economy
2026-09-28 research only source
Cited in: 11 research chapters
Read the full entry
S3
Firmus Technologies, Submission 120, including Oxford Economics Australia letter dated 14 September 2026
2026-09 research only source
Cited in: 17 research chapters
Read the full entry
S4
TasNetworks, Submission 140
2026-09-21 research only source
Cited in: 13 research chapters
Read the full entry
S5
Accela Research, Submission 114
2026-09-21 quoted, checked source
Cited in: Data centres · 9 research chapters
Read the full entry
S6
Environmental Defenders Office, Submission 122
2026-09-21 research only source
Cited in: 1 research chapter
Read the full entry
S7
TasWater, Submission 37 (scanned; OCR text layer produced locally)
2026-09-17 research only source
Cited in: 6 research chapters
Read the full entry
S8
Local Government Association of Tasmania, Submission 82
2026-09-21 research only source
Cited in: 1 research chapter
Read the full entry
S9
Symphony Infrastructure Partners, Submission 144
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S10
Tasmanian Chamber of Commerce and Industry and Clean Energy Tasmania, joint submission 143
2026-09-22 research only source
Cited in: 1 research chapter
Read the full entry
S11
Cradle Coast Authority, Submission 95
2026-09 research only source
Cited in: 2 research chapters
Read the full entry
S12
Latrobe Council, Submission 100
2026-09 research only source
Cited in: 2 research chapters
Read the full entry
S13
Kentish Council, Submission 102
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S14
West Tamar Council, Submission 31
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S15
Planning Matters Alliance Tasmania, Submission 105
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S16
Digital Infrastructure Institute, Submission 73
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S17
Aboriginal Land Council of Tasmania, Submission 108
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S18
UNSW AI Institute, Submission 86
2026-09 figure only source
Cited in: Data centres · 2 research chapters
Read the full entry
S19
Australian Academy of Technological Sciences and Engineering (ATSE), Submission 87
2026-09-21 research only source
Cited in: 1 research chapter
Read the full entry
S20
Australian Information Industry Association (AIIA), Submission 90
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S21
TasICT, Submission 104
2026-09 research only source
Cited in: 2 research chapters
Read the full entry
S22
Victorian Government, Submission 159
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S23
Senator Jacqui Lambie, Submission 150
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S24
Tasmanian Policy Exchange (University of Tasmania), Submission 46
2026-09 figure only source
Cited in: Data centres · 10 research chapters
Read the full entry
S25
Aurora Energy, Submission 16 (scanned; OCR text layer produced locally)
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S26
Vocus Group Limited, Submission 85 (scanned; OCR text layer produced locally)
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S27
Water Services Association of Australia, Submission 112 (scanned; OCR text layer produced locally)
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S28
Voices of Tasmania, Submission 156
2026-09 research only source
Cited in: 2 research chapters
Read the full entry
S29
John Lawrence, Submission 42
2026-09 research only source
Cited in: 7 research chapters
Read the full entry
S30
Climate Tasmania, Submission 79
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S31
Joint Select Committee on Energy Matters (52nd Parliament), Interim Report No. 2, tabled 29 October 2026
2026-10-29 figure only source
Cited in: Data centres · 17 research chapters
Read the full entry
S32
Joint Select Committee on Energy Matters, Interim Report, tabled 21 May 2026
2026-05-21 research only source
Cited in: 2 research chapters
Read the full entry
S33
Aurora Energy media release, 'Aurora Energy and Firmus Technologies sign energy agreement to power Tasmania's AI future', tabled with the Joint Select Committee (redacted copy)
2026-03-25 research only source
Cited in: 9 research chapters
Read the full entry
S34
Firmus Technologies, response to Questions on Notice from the Joint Select Committee on Energy Matters, 17 June 2026 (redacted; page 2 recovered by OCR)
2026-06-17 figure only source
Cited in: Data centres · 5 research chapters
Read the full entry
S35
Acting Coordinator-General, letter to the Chair, Joint Select Committee on Energy Matters, 12 May 2026 (redacted)
2026-05-12 research only source
Cited in: 4 research chapters
Read the full entry
S36
Hydro Tasmania, responses to Questions on Notice, 14 April 2026
2026-04-14 research only source
Cited in: 1 research chapter
Read the full entry
S37
TasNetworks, response to Questions on Notice, 7 May 2026 (scanned; OCR text layer produced locally)
2026-05-07 research only source
Cited in: 1 research chapter
Read the full entry
S38
Minister for Energy and Renewables (Hon Nick Duigan MLC), response to Questions on Notice, 27 August 2026 (redacted)
2026-08-27 research only source
Cited in: 8 research chapters
Read the full entry
S39
Treasurer / Department of Treasury and Finance, response to Questions on Notice, 24 March 2026 (scanned)
2026-03-24 research only source
Cited in: 1 research chapter
Read the full entry
S40
Marinus Link Pty Ltd, response to Question on Notice, 27 March 2026
2026-03-27 research only source
Cited in: 4 research chapters
Read the full entry
S41
'Marinus Link, Project Marinus' costs and benefits', tabled with the Joint Select Committee, 24 February 2026
2026-02-24 research only source
Cited in: 3 research chapters
Read the full entry
S42
Project Marinus RIT-T update summary report, July 2025 (tabled 24 February 2026)
2025-07 research only source
Cited in: 1 research chapter
Read the full entry
S43
Australian Energy Regulator, Final Decision, Marinus Link Stage 1 Part B (construction costs), February 2026 (tabled)
2026-02 research only source
Cited in: 1 research chapter
Read the full entry
S44
FTI Consulting, 'Project Marinus: Analysis of NEM consumer benefits', 8 July 2025 (tabled 24 February 2026)
2025-07-08 research only source
Cited in: 1 research chapter
Read the full entry
S45
Hydro Tasmania, 'Climate and system modelling summary', tabled with the Joint Select Committee, 10 March 2026
2026-03-10 research only source
Cited in: 2 research chapters
Read the full entry
S46
Tasmanian Government, 'Draft Expectations for Data Centres and AI Infrastructure Developers: Tasmania', September 2026 (released 7 September 2026; attached to Submission 154)
2026-09-07 research only source
Cited in: 10 research chapters
Read the full entry
S47
Legislative Council Estimates Committee A, Hon Madeleine Ogilvie MP, official Hansard (v3), 18 November 2025
2025-11-18 research only source
Cited in: 8 research chapters
Read the full entry
S48
House of Assembly Estimates Committee B, Hon Madeleine Ogilvie MP, official Hansard, 20 November 2025
2025-11-20 figure only source
Cited in: Data centres · 8 research chapters
Read the full entry
S49
Legislative Council Hansard, 3 December 2025, Question No. 14 'Data Centres in Tasmania' (answer on notice)
2025-12-03 research only source
Cited in: 2 research chapters
Read the full entry
S50
Legislative Council, Votes and Proceedings No. 48, 3 September 2026, Question No. 60 'Firmus AI Factory Developments in Tasmania' (answer incorporated into Hansard)
2026-09-03 research only source
Cited in: 11 research chapters
Read the full entry
S51
Ministerial routine diary disclosures, Hon Madeleine Ogilvie MP - 15 periods, Jan 2023 to May 2026 (Department of Premier and Cabinet; retrieved via Internet Archive)
2023-01-01/2026-05-31 research only source
Cited in: 8 research chapters
Read the full entry
S52
Department of State Growth, 'Advanced Technology Strategy' (2026), released March 2026
2026-03 research only source
Cited in: 5 research chapters
Read the full entry
S53
Department of Premier and Cabinet, 'Digital Tasmania 2026-2031'
2026-03 research only source
Cited in: 3 research chapters
Read the full entry
S54
Office of the Coordinator-General, 'Data Centre Action Strategy' (UPDATE 2018)
2018 research only source
Cited in: 5 research chapters
Read the full entry
S55
ABC News (Ashleigh Barraclough / Emily Smith), 'AI data centre company Firmus lodges TASCAT appeal against restrictions on generator use', 15 September 2026
2026-09-15 quoted, checked source
Cited in: Data centres · 14 research chapters
Read the full entry
S56
ABC News, 'Tasmania's EPA worried AI company Firmus plans to use generators much more than first disclosed', 10 October 2026
2026-10-10 quoted, checked source
Cited in: Data centres · 13 research chapters
Read the full entry
S57
ABC News (Ashleigh Barraclough), 'Firmus yet to secure full funding for Tasmanian AI data centre project', 21 October 2026
2026-10-21 research only source
Cited in: 15 research chapters
Read the full entry
S58
ABC News, 'Firmus questioned at inquiry over use of diesel generators at planned AI data centres', 10 November 2026
2026-11-10 quoted, checked source
Cited in: Data centres · 8 research chapters
Read the full entry
S59
ABC News, 'How Firmus's plans for the biggest IPO in three decades fell over', 10 October 2026
2026-10-10 research only source
Cited in: 9 research chapters
Read the full entry
S60
The Guardian Australia, 'Firmus pulls biggest ASX float since Telstra amid investor doubt about datacentre company', 9 October 2026
2026-10-09 research only source
Cited in: 10 research chapters
Read the full entry
S61
ABC News, 'Tasmanian minister Madeleine Ogilvie's portfolios redistributed to other ministers after resignation', 5 June 2026
2026-06-05 research only source
Cited in: 3 research chapters
Read the full entry
S62
Premier of Tasmania (Jeremy Rockliff), 'Statement from the Premier', 30 May 2026
2026-05-30 research only source
Cited in: 3 research chapters
Read the full entry
S63
Premier of Tasmania, 'Tasmanian Tech Fest 2026 helping accelerate our digital future', 17 March 2026
2026-03-17 research only source
Cited in: 3 research chapters
Read the full entry
S64
DatacenterDynamics, 'Firmus secures $10bn debt financing facility for Project Southgate AI factory roll out'
2026 research only source
Cited in: 4 research chapters
Read the full entry
S65
ABN Lookup, FIRMUS TECHNOLOGIES PTY LTD, ABN 28 655 498 105
2026-11 research only source
Cited in: 6 research chapters
Read the full entry
S66
DatacenterDynamics, 'AI cloud Firmus secures $505m in equity investment' (Coatue-led, NVIDIA participation, $5.5bn post-money)
2026-04 research only source
Cited in: 5 research chapters
Read the full entry
S67
Australian Telecommunications Alliance, Submission 123
2026-09 research only source
Cited in: 2 research chapters
Read the full entry
S68
Westcoast Renewable Energy, Submission 151
2026-09-21 research only source
Cited in: 2 research chapters
Read the full entry
S69
LMS Energy, Submission 142
2026-09-22 research only source
Cited in: 2 research chapters
Read the full entry
S70
Environmental Awareness Association Inc., Submission 103
2026-09 research only source
Cited in: 4 research chapters
Read the full entry
S71
Pulse Tasmania, 'Firmus forecasts 8,900 jobs and $46b economic boost for Tasmania'
2026-11-10 research only source
Cited in: 11 research chapters
Read the full entry
S72
Firmus newsroom, 'Firmus surpasses 900 MW contracted capacity, adds OpenAI as anchor customer and expands into Malaysia'
2026 figure only source
Cited in: Data centres · 7 research chapters
Read the full entry
S73
Firmus newsroom, 'Firmus to Build Grid-Integrated AI Factory Software with NVIDIA' (Model-to-Grid / NVIDIA DSX)
2026 research only source
Cited in: 2 research chapters
Read the full entry
S74
ABC News (Bec Pridham), 'Firmus' AI research lab green-lit as ageing Tasmanian planning laws defended'
2026-11-04 figure only source
Cited in: Data centres · 13 research chapters
Read the full entry
S75
Tasmanian Integrity Commission, Register of Lobbyists (Cloudflare managed challenge; not retrievable by automated access — no Wayback snapshot of the register exists)
accessed 2026-11-11 research only source
Cited in: 3 research chapters
Read the full entry
S76
Tasmanian Electoral Commission, 'Public registers, reports and portal' (notes TEC Disclosures portal live from 3 July 2026)
accessed 2026-11-11 research only source
Cited in: 1 research chapter
Read the full entry
S77
Tasmanian Electoral Commission, 'Monthly disclosures' — reportable political donations outside election periods; table is client-side rendered, no static data
accessed 2026-11-11 research only source
Cited in: 1 research chapter
Read the full entry
S78
TEC Disclosures portal (Power Pages application; interactive search required)
accessed 2026-11-11 research only source
Cited in: 1 research chapter
Read the full entry
S79
Department of Treasury and Finance, Minute to the Treasurer — 'Firmus Technologies Pty Ltd connection enquiry - St Leonards expansion' (doc ref 26/61125), released under RTI 2526-023
c.2026-03 quoted, checked source
Cited in: Data centres · 21 research chapters
Read the full entry
S80
Hydro Tasmania, Draft Corporate Plan FY2026/27 – FY2029/30 (CONFIDENTIAL), released under RTI 2526-025
2026 research only source
Cited in: 7 research chapters
Read the full entry
S81
Department of Treasury and Finance, Parliamentary Briefing for the Treasurer — 'T49. Government businesses - financial returns to Government', 13 January 2026, released under RTI 2526-024
2026-01-13 research only source
Cited in: 5 research chapters
Read the full entry
S82
Department of Treasury and Finance, Right to Information disclosure log
accessed 2026-11-11 research only source
Cited in: 1 research chapter
Read the full entry
S83
Hydro Tasmania RTI release to Dean Winter MP, 22 July 2026 — 278pp: board papers, term sheets (Hydro–Aurora), correspondence with Government, pricing analysis
2026-07-22 quoted, checked source
Cited in: Data centres · 20 research chapters
Read the full entry
S84
Hydro Tasmania letter to Firmus Technologies, 'Pricing long-term electricity supply for Firmus' Tasmanian facilities', 10 June 2026 (released to ABC under RTI)
2026-06-10 quoted from page image source
Cited in: Data centres · 14 research chapters
Read the full entry
S85
Hydro Tasmania, Right to Information disclosures (register of released documents)
accessed 2026-11-11 research only source
Cited in: 4 research chapters
Read the full entry
S86
Tasmanian Government (Building Tasmania), Expectations for Data Centres and AI Infrastructure Proponents: Tasmania — final, including the Local Community Benefit Fund policy
2026-11-13 figure only source
Cited in: Data centres · 15 research chapters
Read the full entry
S87
ABC News (Josh Duggan), 'AI data centres to self-administer funds in Tasmanian community benefit deal'
2026-11-13 research only source
Cited in: 3 research chapters
Read the full entry
S88
ABC News (Cam Wilson), 'Firmus's AI data centre commitments in doubt due to failed float, documents show'
2026-10-29 research only source
Cited in: 1 research chapter
Read the full entry
S89
Hydro Tasmania, 'Hydro Tasmania and Firmus Technologies' — public position statement, last updated 27 October 2026
2026-10-27 research only source
Cited in: 13 research chapters
Read the full entry
S90
Firmus Technologies newsroom, 'Firmus to Build 170,000 GPU AI Factory Campus with NVIDIA for Global AI-Natives'
2026-06 research only source
Cited in: 1 research chapter
Read the full entry
S91
NAOS Ex-50 Opportunities Company Limited (ASX: NAC), Annual Report for the year ended 30 June 2026
2026 research only source
Cited in: 1 research chapter
Read the full entry
S92
CDC Data Centres, 'Wagga Wagga community set to receive $225m in benefits from CDC data centre investment'
2026-10-13 research only source
Cited in: 2 research chapters
Read the full entry
S93
City of Wagga Wagga, Have Your Say — 'Ashford Road Gregadoo - Data Centre Proposal' (staged campus; est. development cost ~$15bn; power demand up to 1.4 GW)
2026-10 research only source
Cited in: 1 research chapter
Read the full entry
S94
NSW Government, NSW Data Centre Guidelines (August 2026)
2026-08 research only source
Cited in: 2 research chapters
Read the full entry
S95
NSW Department of Climate Change, Energy, the Environment and Water, 'Reforms to electricity network connection and cost recovery arrangements for data centres in NSW'
2026 research only source
Cited in: 1 research chapter
Read the full entry
S96
Australian Government, Department of Industry, Science and Resources, 'Expectations of data centres and AI infrastructure developers'
2026-03-23 research only source
Cited in: 2 research chapters
Read the full entry
S97
ABC News (Emily Smith), 'Bellbuoy Beach residents worry link between health minister and Equis wind farm project could dilute advocacy'
2026-04-07 research only source
Cited in: 2 research chapters
Read the full entry
S98
ABC News, 'AI data centre companies expected to pay into new Tasmanian Community Benefit Fund' (fund announced without a rate or structure)
2026-10-14 research only source
Cited in: 5 research chapters
Read the full entry
S99
Pulse Tasmania, 'Government sets $3,000 a megawatt AI data centre community benefit fund'
2026-11-13 research only source
Cited in: 2 research chapters
Read the full entry
S100
UK Government, 'Community benefits guidance for onshore wind in England' (accessible webpage) — £5,000/MW/yr floor, CPI indexation, 5 MW threshold
2025-07 research only source
Cited in: 1 research chapter
Read the full entry
S101
Scottish Government, 'Refreshing the good practice principles for community benefits: working paper' — Section 2, Fund Levels (proposed £6,000/MW wind; £700-1,000/MW solar; >=£150/MW battery)
2026-02 research only source
Cited in: 1 research chapter
Read the full entry
S102
UK Government, 'Energy Independence Bill factsheet: Mandatory Community Benefits for generation' — contractual community benefit agreement and a Great Britain-wide register
2026 research only source
Cited in: 1 research chapter
Read the full entry
S103
Submission 93, House of Assembly Government Administration Committee A, Inquiry into AI Data Centres in Tasmania (Ruth Howard, private citizen) — proposes an illustrative capacity/energy royalty
2026-09-21 research only source
Cited in: 2 research chapters
Read the full entry
S104
Submission 88, House of Assembly Government Administration Committee A, Inquiry into AI Data Centres in Tasmania (private witness) — proposes an 'AI Data Centre tax per MW'
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S105
TasNetworks, corporate post 'Celebrating our first Bright Future Fund recipients' — records that the Independent Community Panel selected twelve projects, first round, NWTD
2026-09 research only source
Cited in: 1 research chapter
Read the full entry
S106
Submission 94, Inquiry into AI Data Centres in Tasmania (Robyn Lewis) — 'No Financial Clawback or Security Bond to protect Tasmania'
2026-09-21 research only source
Cited in: 4 research chapters
Read the full entry
S107
Submission 125, Inquiry into AI Data Centres in Tasmania (Fernando Bacchereti) — disclosure, risk and oversight; proposes deposits/bank guarantees, staged release, clawback and concentration limits
2026-09-21 research only source
Cited in: 3 research chapters
Read the full entry
S108
Submission 139, Inquiry into AI Data Centres in Tasmania (Kurt Joyce) — interconnection requests as cheap options; AEP Ohio large-load tariff evidence; proposes capacity deposits, use-it-or-lose-it milestones and lapse
2026-09-21 research only source
Cited in: 4 research chapters
Read the full entry
S109
Submission 22, Inquiry into AI Data Centres in Tasmania (Nick Barnes) — six additional confidential proposals consuming at least 500 MW; a 50 MW concept interested in the closed Liberty Bell Bay site
2026-09 research only source
Cited in: 5 research chapters
Read the full entry
S110
Australian Energy Market Commission, 'Cost recovery for network augmentations' — consultation paper on rule change requests ERC0448 and ERC0456 (proponent: the Commonwealth Minister for Climate Change and Energy), September 2026
2026-09 research only source
Cited in: 6 research chapters
Read the full entry
S111
NSW Department of Climate Change, Energy, the Environment and Water, 'Reforming electricity network connection and cost recovery arrangements for data centres in NSW' — consultation paper proposing a A$30,000/MW entry bond and a A$100,000-200,000/MW Major Network Upgrade Fee; records South Australia's 100 MW augmentation requirement
2026-08 research only source
Cited in: 3 research chapters
Read the full entry
S112
Hydro Tasmania, Annual Report 2025-26 — dividend policy (90% payout of profit before fair value movements and revaluation expenses, less tax) and FY2025-26 dividend of A$1.6m
2026-09 research only source
Cited in: 3 research chapters
Read the full entry
S113
AEMO, Demand Terms in EMMS Data Model v10.0 — formal definitions of operational, total and underlying demand, and the construction of TotalDemand by NEMDE
2025-07 research only source
Cited in: 1 research chapter
Read the full entry
S114
JSC on Energy Matters (52nd Parliament), transcript of public hearing 20 October 2026 — Aurora Energy (N. Clark, O. Cousland, E. Flett) and Firmus Technologies (P. Grzinic)
2026-10-20 research only source
Cited in: 6 research chapters
Read the full entry
S115
Legislative Council, QON No. 60 answer (tabled 3 September 2026, Appendix 1 pp.73–79) — the government's formal answer on due diligence of Firmus Technologies
2026-09-03 research only source
Cited in: 3 research chapters
Read the full entry
S116
Tasmanian Government, Submission 154 to the Inquiry into AI Data Centres in Tasmania, including Annexure A (Office of the Coordinator-General)
2026-10 quoted, checked source
Cited in: Data centres · 3 research chapters
Read the full entry
S117
Standing Committee on Government Administration A, Terms of Reference for the Inquiry into AI Data Centres in Tasmania — resolution of 5 August 2026
2026-08-05 research only source
Cited in: 2 research chapters
Read the full entry
S118
Department of Premier and Cabinet, 'Firmus Correspondence' - RTI release, 29 May 2026 (5pp, scanned)
2026-05-29 research only source
Cited in: 2 research chapters
Read the full entry
S119
Joint Select Committee on Energy Matters (52nd Parliament), transcript of public hearing, 21 October 2026 - Minister Ellis, Office of the Coordinator-General, Building Tasmania, TasICT
2026-10-21 research only source
Cited in: 5 research chapters
Read the full entry
S120
Premier's routine diary disclosure, Hon Jeremy Rockliff MP, 1-31 May 2026 (retrieved via Internet Archive)
2026-05-31 research only source
Cited in: 1 research chapter
Read the full entry
S121
House of Assembly, response to Notice of Motion No. 146 - public update on Firmus energy negotiations and the draft Statement of Expectations (tabled paper TP52-1-486), 8 September 2026
2026-09-08 research only source
Cited in: 6 research chapters
Read the full entry
S122
Tasmanian Policy Exchange, 'Models of data-centre community benefit sharing for Tasmania' - policy brief for the GAA-A inquiry, November 2026
2026-11 research only source
Cited in: 2 research chapters
Read the full entry
S123
Tasmanian Electoral Commission, Disclosed reportable political donations — register query result, 24 distinct published records, captured 19 November 2026
2026-11-19 research only source
Cited in: 1 research chapter
Read the full entry
S124
Hydro Tasmania, 'Contract pricing' - regulated offer prices, the weekly published pricing model, and the non-regulated Rate Card
2026-11-18 research only source
Cited in: 3 research chapters
Read the full entry
S125
TasNetworks, 'Transmission Load Connections Process' - committed-project criteria for load connections
2026-11-19 research only source
Cited in: 4 research chapters
Read the full entry
S126
TasNetworks, Generator Connection Agreement - standard template, version 25 May 2026 (clause 18 Security; Schedule 9)
2026-05-25 research only source
Cited in: 3 research chapters
Read the full entry
S127
Pulse Tasmania, 'Firmus will pay whatever the cost is for Tasmanian AI factory power', 12 November 2026
2026-11-12 research only source
Cited in: 4 research chapters
Read the full entry
S128
Pulse Tasmania, 'Most of Firmus Tasmanian plans still need funding, inquiry told', 23 October 2026
2026-10-23 research only source
Cited in: 5 research chapters
Read the full entry
S129
Reuters (via Channel NewsAsia), 'Australia's corporate regulator says talking to bankers over failed $5 billion Firmus IPO', 29 October 2026
2026-10-29 research only source
Cited in: 2 research chapters
Read the full entry
S130
ABC News, 'Six new AI data centres proposed for Tasmania, but companies behind them are being kept secret', 9 September 2026
2026-09-09 research only source
Cited in: 1 research chapter
Read the full entry
S131
ABC News, 'AI data centre company cold calling rural residents about buying Tasmanian land, inquiry told', 21 October 2026
2026-10-21 research only source
Cited in: 1 research chapter
Read the full entry
S132
Pulse Tasmania, 'TasWater fields six data centre requests for water supply, inquiry told', 13 November 2026
2026-11-13 research only source
Cited in: 2 research chapters
Read the full entry
S133
Government Administration Committee A, public hearing witness schedule, Friday 20 November 2026 (Hydro Tasmania)
2026-11-03 research only source
Cited in: 2 research chapters
Read the full entry
S134
Office of the Tasmanian Economic Regulator, 'Wholesale Pricing' - regulatory framework for wholesale price regulation
2019-09-25 research only source
Cited in: 2 research chapters
Read the full entry
S135
Office of the Tasmanian Economic Regulator, 'Wholesale Pricing Explained' - the regulated contracting obligations
2017-09-29 research only source
Cited in: 1 research chapter
Read the full entry
S136
Office of the Tasmanian Economic Regulator, 'Wholesale Pricing Model' - the rules-based Victorian-to-Tasmanian methodology
2023-06-08 research only source
Cited in: 1 research chapter
Read the full entry
S137
Tasmania, Wholesale Contract Regulatory Instrument (1 July 2024 - 30 June 2029)
2024-07-01 research only source
Cited in: 4 research chapters
Read the full entry
S138
Hydro Tasmania, Tasmanian wholesale regulated pricing model (published 17 November 2026)
2026-11-17 research only source
Cited in: 2 research chapters
Read the full entry
S139
Hydro Tasmania, weekly regulated offer, 17 November 2026 (WholesalePrice.csv)
2026-11-17 research only source
Cited in: 3 research chapters
Read the full entry
S140
Hydro Tasmania, 'Historical contract pricing' - the weekly regulated offer archive
2026-11-19 research only source
Cited in: 4 research chapters
Read the full entry
S141
AEMC, rule change page: cost recovery for network augmentations - Package 2 (ERC0448, ERC0456)
2026-09-24 research only source
Cited in: 2 research chapters
Read the full entry
S142
AEMC, rule change page: operational integration and visibility of large inverter-based loads (ERC0455)
2026-11-19 research only source
Cited in: 2 research chapters
Read the full entry
S143
AEMC, ERC0448 and ERC0456 initiation information sheet (September 2026)
2026-09-01 research only source
Cited in: 2 research chapters
Read the full entry
S144
ACS, Australia's Digital Pulse 2026
2026 research only source
Cited in: 1 research chapter
Read the full entry
S145
Population Snapshot: Tasmania, September 2025
2025-09 research only source
Cited in: 1 research chapter
Read the full entry
S146
2025 Population Statement: Tasmania snapshot
2026-01 research only source
Cited in: 1 research chapter
Read the full entry
S147
Bahar & Wright, The Local Economic Impact of Data Centers
2026-08-07 research only source
Cited in: 1 research chapter
Read the full entry
S148
Alvarez, Argente, Chow & Van Patten, Data Centers and Local Economies in the Age of AI
2026-05 research only source
Cited in: 1 research chapter
Read the full entry
S149
Georgia Tech Scheller, Data Centers Are Booming. Who Benefits? (summary of Yue & Zeng)
2026-07-09 research only source
Cited in: 1 research chapter
Read the full entry
S150
Quello Center, The Economic Impacts of Data Centers in Rural Communities: A Narrative Review
2026-10 research only source
Cited in: 1 research chapter
Read the full entry
S151
Nordic Labour Journal, Scandinavian data centres: fewer jobs and less profit than forecast
2023-04-28 research only source
Cited in: 1 research chapter
Read the full entry
S152
Yle, Googlen tulo kaupunkiin oli Haminalle jattipotti
2024-11-29 research only source
Cited in: 1 research chapter
Read the full entry
S153
Yle, Google osti paperitehtaan Haminasta yli 15 vuotta sitten
2026-09-10 research only source
Cited in: 1 research chapter
Read the full entry
S154
The Irish Times, Just because Ireland is good for data centres does not mean they are good for us
2024-09-06 research only source
Cited in: 1 research chapter
Read the full entry
S155
Public Policy.ie, Data Centres in Ireland
2024-10-01 research only source
Cited in: 1 research chapter
Read the full entry
S156
ABC News, Tasmania's premier maintains support for Firmus investment
2026-10-15 research only source
Cited in: 1 research chapter
Read the full entry
S157
Hansard extract (Tasmanian Greens), Innovation, Science and the Digital Economy - Artificial Intelligence, 18 Nov 2025
2025-11-18 research only source
Cited in: 1 research chapter
Read the full entry
S158
Mandala Partners for Data Centres Australia, The Economic Contribution of the Data Centre Industry in Australia
2026-08 research only source
Cited in: 1 research chapter
Read the full entry
S159
Premier of Tasmania, Preparing for our digital future, together
2025-02-18 research only source
Cited in: 1 research chapter
Read the full entry
S160
Google, Google Deepens Commitment to Finland with Two-Year EUR13 Billion Investment
2026-09-09 research only source
Cited in: 1 research chapter
Read the full entry
S161
City of Hamina, Google's new giant investment strengthens Hamina as a pioneer in data center operations
2026-09-09 research only source
Cited in: 1 research chapter
Read the full entry
S162
DXN Limited, Strategic Divestment of Non-Core Tasmanian Data Centre (ASX)
2026-06-30 research only source
Cited in: 1 research chapter
Read the full entry
S163
Viridis Green Data Centres, Tasmanian data centre development given planning approval (Burnie)
2025-10 research only source
Cited in: 1 research chapter
Read the full entry
S164
Engineers Australia, Contract awarded for secure data storage for Tasmania (Networking Tasmania III)
2015-12 research only source
Cited in: 1 research chapter
Read the full entry
S165
House of Assembly, Notices of Motion and Orders of the Day No. 56, Wednesday 18 November 2026
2026-11-18 figure only source
Cited in: Data centres · 2 research chapters
Read the full entry
S166
Data Centre Safeguards Bill 2026 (54 of 2026)
2026-11-17 figure only source
Cited in: Data centres · 2 research chapters
Read the full entry
S167
Clause Notes, Data Centre Safeguards Bill 2026
2026-11-17 research only source
Cited in: 1 research chapter
Read the full entry
S168
Data Centre Safeguards Bill 2026 fact sheet
2026-11-17 research only source
Cited in: 1 research chapter
Read the full entry
S169
Parliament of Tasmania, bill page: Data Centre Safeguards Bill 2026 (54 of 2026)
2026-11 research only source
Cited in: 1 research chapter
Read the full entry
S170
Tasmanian Greens, Data Centre Moratorium Motion Passes Parliament
2026-11-18 figure only source
Cited in: Data centres · 2 research chapters
Read the full entry
S171
ABC News, Northern Tasmania local news briefing, 19 November 2026
2026-11-19 research only source
Cited in: 1 research chapter
Read the full entry
S172
ABC News, Northern Tasmania local news briefing, 16 November 2026
2026-11-16 research only source
Cited in: 1 research chapter
Read the full entry
S173
Pulse Tasmania, Labor calls for Tasmanian data centre freeze until safeguards in place
2026-11-15 research only source
Cited in: 1 research chapter
Read the full entry
S174
Pulse Tasmania, Independent MP tables data centre moratorium bill as government rules out support
2026-11-18 research only source
Cited in: 2 research chapters
Read the full entry
S175
AAP, Tasmanian MPs back pause on rolling out AI data centres
2026-11-18 research only source
Cited in: 1 research chapter
Read the full entry
S176
ABC News, Hydro Tasmania to decide on Firmus's 450 MW request
2026-09-04 figure only source
Cited in: Data centres · 1 research chapter
Read the full entry
S177
ABC News, Tasmanian premier refuses to enact data centre moratorium
2026-11-19 quoted, checked source
Cited in: Data centres · 4 research chapters
Read the full entry
S178
Hydro Tasmania, Hydro Tasmania and Firmus Technologies (webpage)
2026-10-27 research only source
Cited in: 1 research chapter
Read the full entry
S179
Hydro Tasmania, Submission No. 152, Inquiry into AI Data Centres
2026-09-22 research only source
Cited in: 1 research chapter
Read the full entry
S180
TasNetworks, Submission No. 140, Inquiry into AI Data Centres
2026-09-21 research only source
Cited in: 1 research chapter
Read the full entry
S181
Environmental Defenders Office, submission on the Draft Expectations
2026-10-12 research only source
Cited in: 1 research chapter
Read the full entry
S182
Premier of Tasmania, Tasmanian expectations for AI, data centres released
2026-11-13 research only source
Cited in: 1 research chapter
Read the full entry
S183
GAA Committee A, witness schedule, 20 November 2026
2026-11-20 research only source
Cited in: 1 research chapter
Read the full entry
S184
Defence Legislation Amendment (Accelerating Capability and Protecting Bases) Bill 2026 (as introduced)
2026-10-27 research only source
Cited in: 1 research chapter
Read the full entry
S185
Senate, Schedule of amendments made by the Senate, 19 November 2026
2026-11-19 research only source
Cited in: 1 research chapter
Read the full entry
S186
PJC on Defence, Review of the Defence bill, Chapter 5
2026-11 research only source
Cited in: 1 research chapter
Read the full entry
S187
Firmus, Southgate project page
2026 research only source
Cited in: 1 research chapter
Read the full entry
S188
Bills Digest No. 27, 2026-27
2026-11-13 research only source
Cited in: 1 research chapter
Read the full entry